Abrator Series Installation
Date:2007-2-8
 

Obey following rules for installation:

1.    Mainframe: levelness and weight of mainframe must reach standard of blueprint.

2.    Installation of subparts should be installed from lower part to upper side

3.    Rack type or suspension chain and table roller type should be wrapped from inside to outside.

4.    Pre-test should be carried out before put into operation wholly.

 